You would want to reuse common piece of jenkins builds to use DRY. for e.g. if you have multiple instances like dev, psr, uat and a deploy target for each instance or you have installer targets per branch. Then only thing that is different is the instance where you are deploying or the branch that you are building respectively. Two weekends before I ran into an issue where I was creating a target to auto deploy a build on an instance and problem was I had following build targets

UAT -->AnyDeploy->Run-Tests
QA->AnyDeploy->Run-Tests
Dev->AnyDeploy->Run-Tests

So I had AnyDeploy and Run-Tests as shared targets that I was triggering using parameterized builds now I wanted to archive test results on top level targets(UAT,QA,Dev). Now jenkins already has an option to aggregate downstream test results but problem was that my friend had written some cryptic test runner and junit formatter that was printing results in some non standard format. So I installed copy artifact plugin and at end of build I was copying last build artifact back but we ran into interesting issues because

UAT tests would run full suite and take 10 min but dev suite will run mini suite and finish in 1 min so if someone triggered UAT test and then dev then dev would finish first and you would get wrong results attached to UAT build when it finishes. So he asked my help to fix it.  This was a nice problem and took me 2 hours but was worth it.

so jenkins has a way to give you the triggered build number of a downstream target in format of $TRIGGERED_BUILD_NUMBER_XXX where XXX is the build target name. It sounded like a piece of cake to configure the copy artifact target like this and get the job done but this was not working.



Finally after struggling for 2 hours with him I found out that it was this "-" that was causing issue.  I renamed the jenkins build to Run_Tests and that immediately solved the issue.

Comments

  1. A bit late to the party, but you could also have just written the variable name like this:

    ${TRIGGERED_BUILD_NUMBER_Run-Tests}

    ReplyDelete
  2. I was wrong about the ${}'s .. I now agree that the "-" is evil :) I retested my case and it did not work with a "-" afterall.

    ReplyDelete

Post a Comment

Popular posts from this blog

Killing a particular Tomcat thread

Update: This JSP does not work on a thread that is inside some native code.  On many occasions I had a thread stuck in JNI code and it wont work. Also in some cases thread.stop can cause jvm to hang. According to javadocs " This method is inherently unsafe. Stopping a thread with Thread.stop causes it to unlock all of the monitors that it has locked". I have used it only in some rare occasions where I wanted to avoid a system shutdown and in some cases we ended up doing system shutdown as jvm was hung so I had a 70-80% success with it.   -------------------------------------------------------------------------------------------------------------------------- We had an interesting requirement. A tomcat thread that was spawned from an ExecutorService ThreadPool had gone Rogue and was causing lots of disk churning issues. We cant bring down the production server as that would involve downtime. Killing this thread was harmless but how to kill it, t

Adding Jitter to cache layer

Thundering herd is an issue common to webapp that rely on heavy caching where if lots of items expire at the same time due to a server restart or temporal event, then suddenly lots of calls will go to database at same time. This can even bring down the database in extreme cases. I wont go into much detail but the app need to do two things solve this issue. 1) Add consistent hashing to cache layer : This way when a memcache server is added/removed from the pool, entire cache is not invalidated.  We use memcahe from both python and Java layer and I still have to find a consistent caching solution that is portable across both languages. hash_ring and spymemcached both use different points for server so need to read/test more. 2) Add a jitter to cache or randomise the expiry time: We expire long term cache  records every 8 hours after that key was added and short term cache expiry is 2 hours. As our customers usually comes to work in morning and access the cloud file server it can happe

Preparing for an interview after being employed 11 years at a startup

I would say I didn't prepared a hell lot but  I did 2 hours in night every day and every weekend around 8 hours for 2-3 months. I did 20-30 leetcode medium problems from this list https://leetcode.com/explore/interview/card/top-interview-questions-medium/.  I watched the first 12 videos of Lecture Videos | Introduction to Algorithms | Electrical Engineering and Computer Science | MIT OpenCourseWare I did this course https://www.educative.io/courses/grokking-the-system-design-interview I researched on topics from https://www.educative.io/courses/java-multithreading-for-senior-engineering-interviews and leetcode had around 10 multithreading questions so I did those I watched some 10-20 videos from this channel https://www.youtube.com/channel/UCn1XnDWhsLS5URXTi5wtFTA